Asset under management
The 330km motorway from Ankara – Nigde, costing approximately EUR 1.5B was officially completed in 2019 with SSB AG playing a major role across all phases of construction in delivering the project within the budget and construction schedule.
The project is the missing link of the Turkish TEM Project with the travel distance between the Ankara and Nigde provinces being reduced by approximately 40 km. The Project is expected to significantly ease the flow of traffic and in addition strengthen the social and commercial relations between the northwest and southeast of Turkey.
The project, with an operational period of 15 years, is expected to drastically enhance economic growth, trade options and also the logistics capacity between multiple districts through the elimination of existing physical barriers. SSB AG is currently working in conjunction with a highly experienced third-party operator in ensuring the smooth operation of the asset.